Resource Management Model to Reduce Maintenance Service Times for SMEs in Lima-Peru. | 0 | 0.34 | 2021 |
Production Planning and Control Model to Increase On-Time Deliveries Through Demand-Driven MRP and PDCA in a Make-to-Order Environment of Non-primary Manufacturing Industry. | 0 | 0.34 | 2021 |
Inventory Optimization Model Applying the FIFO Method and the PHVA Methodology to Improve the Stock Levels of Olive Products in SMEs of the Agro-Industrial Sector in Peru. | 0 | 0.34 | 2021 |
Production Management Model for the Evaluation of Operator's Posture-Base Measurement and to Redesign Work Area to Improve Labor Productivity in a Manufacturing SME. | 0 | 0.34 | 2021 |
Model for Optimization of Spaces Through the Redistribution of Warehouse and Application of Lean Logistics to Reduce Service Times Within an Air Cargo Company. | 0 | 0.34 | 2021 |
Integrated Lean Model Under the Theory of Constraints Approach that Allows Increased Production in Cement Companies in Lima, Peru. | 0 | 0.34 | 2021 |
Improvement of the Polymer Insulation Production Process Using Lean Manufacturing Tools and Plant Layout Design. | 0 | 0.34 | 2020 |