An approximate ϵ-constraint method for a multi-objective job scheduling in the cloud | 11 | 0.47 | 2013 |
An optimization-based heuristic for the Multi-objective Undirected Capacitated Arc Routing Problem | 9 | 0.51 | 2012 |
A niched genetic algorithm to solve a pollutant emission reduction problem in the manufacturing industry: A case study | 0 | 0.34 | 2007 |
A Lagrangean Heuristic for the Plant Location Problem with Multiple Facilities in the Same Site | 2 | 0.38 | 2002 |
Parallel algorithms to solve two-stage stochastic linear programs with robustness constraints | 5 | 0.57 | 2000 |
Solving Large-Scale Network Transportation Problems On A Cluster Of Workstations | 0 | 0.34 | 1997 |
A parallel implementation of automatic differentiation for partially separable functions using PVM | 1 | 0.37 | 1996 |
A model of efficient asynchronous parallel algorithms on multicomputer systems | 6 | 0.66 | 1992 |
Numerical comparisons of nonlinear programming algorithms on serial and vector processors using automatic differentiation. | 3 | 0.65 | 1988 |