Name
Playground
About
FAQ
GitHub
Playground
Shortest Path Finder
Community Detector
Connected Papers
Author Trending
Claudia Calabrese
Andrés Felipe Giraldo-Forero
lixin ma
Hao Mao
Peter Malec
Rita Loogen
Giovanni Venturelli
Chen Ma
Radu Timofte
Kuanrui Yin
Home
/
Author
/
ENRIQUE GERSTL
Author Info
Open Visualization
Name
Affiliation
Papers
ENRIQUE GERSTL
School of Business Administration, The Hebrew University, Jerusalem 91905, Israel
19
Collaborators
Citations
PageRank
4
63
7.72
Referers
Referees
References
109
217
219
Search Limit
100
217
Publications (19 rows)
Collaborators (4 rows)
Referers (100 rows)
Referees (100 rows)
Title
Citations
PageRank
Year
The Single Machine Con Problem With Unavailability Period
0
0.34
2021
Single machine scheduling to maximize the number of on-time jobs with generalized due-dates
2
0.38
2020
Semi-V-Shape Property For Two-Machine No-Wait Proportionate Flow Shop Problem With Tadc Criterion
1
0.37
2019
Semi-V-Shape Property For Two-Machine No-Wait Proportionate Flow Shop Problem With Tadc Criterion
1
0.37
2019
Scheduling On A Proportionate Flowshop To Minimise Total Late Work
1
0.36
2019
Scheduling On A Proportionate Flowshop To Minimise Total Late Work
1
0.36
2019
Minmax weighted earliness-tardiness with identical processing times and two competing agents.
0
0.34
2017
Single Machine Scheduling Problems With Generalised Due-Dates And Job-Rejection
4
0.41
2017
Scheduling with two competing agents to minimize total weighted earliness.
1
0.35
2017
Scheduling with a due-window for acceptable lead-times
1
0.35
2015
A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshop.
3
0.49
2015
The optimal number of used machines in a two-stage flexible flowshop scheduling problem
3
0.42
2014
Due-window assignment problems with unit-time jobs.
6
0.50
2013
Due-window assignment with identical jobs on parallel uniform machines.
6
0.44
2013
Minmax due-date assignment with a time window for acceptable lead-times.
1
0.35
2013
Scheduling problems with two competing agents to minimized weighted earliness-tardiness
19
0.66
2013
An improved algorithm for due-window assignment on parallel identical machines with unit-time jobs
2
0.37
2013
Scheduling job classes on uniform machines
1
0.36
2012
Scheduling on parallel identical machines with job-rejection and position-dependent processing times
10
0.52
2012
1