Name
Papers
Collaborators
DANIEL RIERA
23
37
Citations 
PageRank 
Referers 
421
18.85
739
Referees 
References 
621
362
Search Limit
100739
Title
Citations
PageRank
Year
A simheuristic algorithm for solving the arc-routing problem with stochastic demands60.392018
Gamification: a systematic review of design frameworks.80.652017
ACO and CP Working Together to Build a Flexible Tool for the VRP.00.342016
A Literature Review of Gamification Design Frameworks281.402015
On the verification of UML/OCL class diagrams using constraint programming.381.012014
A simheuristic algorithm for solving the permutation flow shop problem with stochastic processing times.190.602014
Rich Vehicle Routing Problem: Survey451.052014
On the use of biased randomization and simheuristics to solve Vehicle and Arc Routing Problems00.342014
Multi-start Approach for Solving an Asymmetric Heterogeneous Vehicle Routing Problem in a Real Urban Context.00.342013
SIM-RandSHARP: a hybrid algorithm for solving the Arc Routing Problem with Stochastic Demands40.412012
Development and assessment of the SHARP and RandSHARP algorithms for the arc routing problem80.462012
On the use of Monte Carlo simulation, cache and splitting techniques to improve the Clarke and Wright savings heuristics481.742011
Combining probabilistic algorithms, Constraint Programming and Lagrangian Relaxation to solve the Vehicle Routing Problem60.452011
A Simulation-based Methodology to Assist Decision-makers in Real Vehicle Routing Problems00.342009
Applying Simulation and Reliability to Vehicle Routing Problems with Stochastic Demands.00.342009
Verifying UML/OCL Operation Contracts230.982009
Verification of UML/OCL Class Diagrams using Constraint Programming722.602008
UMLtoCSP: a tool for the formal verification of UML/OCL models using constraint programming1013.152007
UMLtoCSP: Una herramienta para la verificación de modelos UML/OCL mediante Constraint Programming.00.342007
A Petri Nets-Based Scheduling Methodology for Multipurpose Batch Plants10.372005
Optimization of Logistic and Manufacturing Systems through Simulation: A Colored Petri Net-Based Methodology60.562004
An Improved Hybrid Model for the Generic Hoist Scheduling Problem80.652002
PN to CSP Methodology: Improved Bounds00.342002