An exact root-free method for the expected queue length for a class of discrete-time queueing systems | 0 | 0.34 | 2019 |
Moving to additive manufacturing for spare parts supply. | 0 | 0.34 | 2019 |
Emergency supply contracts for a service provider with limited local resources. | 1 | 0.35 | 2019 |
FISOF: A formal industrial symbiosis opportunity filtering method | 0 | 0.34 | 2019 |
Integrated planning of spare parts and service engineers with partial backlogging | 1 | 0.36 | 2017 |
Last time buy and repair decisions for spare parts. | 14 | 0.58 | 2015 |
Service differentiation through selective lateral transshipments. | 1 | 0.35 | 2014 |
A Generic Control Architecture for Material Handling Systems Applied to a Baggage Handling System. | 0 | 0.34 | 2013 |
Generic planning and control of automated material handling systems: Practical requirements versus existing theory. | 1 | 0.39 | 2013 |
A generic material flow control model applied in two industrial sectors | 2 | 0.40 | 2013 |
Performance analysis of parallel identical machines with a generalized shortest queue arrival mechanism | 3 | 0.48 | 2001 |
Capacity analysis of an automated kit transportation system | 0 | 0.34 | 2000 |
Warehouse design and control: Framework and literature review | 95 | 11.06 | 2000 |
Towards intelligent manufacturing planning and control systems | 15 | 2.53 | 2000 |
Matrix-geometric analysis of the shortest queue problem with threshold jockeying | 7 | 1.19 | 1993 |
Analysis of the asymmetric shortest queue problem | 22 | 3.52 | 1991 |
Exponential Convergence in Undiscounted Continuous-Time Markov Decision Chains | 0 | 0.34 | 1987 |