Facets of the Stochastic Network Flow Problem. | 0 | 0.34 | 2020 |
Quantity-Contingent Auctions and Allocation of Airport Slots | 0 | 0.34 | 2020 |
Majority judgment over a convex candidate space | 0 | 0.34 | 2019 |
Stochastic Optimization Models for Transferring Delay Along Flight Trajectories to Reduce Fuel Usage | 0 | 0.34 | 2018 |
Analysis of seat allocation and overbooking decisions with hybrid information. | 4 | 0.45 | 2015 |
Sparse Monge matrices arising from scheduling problems. | 1 | 0.35 | 2013 |
Determining the Number of Airport Arrival Slots | 4 | 0.64 | 2013 |
Managing an Available-to-Promise Assembly System with Dynamic Short-Term Pseudo-Order Forecast | 6 | 0.45 | 2012 |
Regret in Overbooking and Fare-Class Allocation for Single Leg | 11 | 0.66 | 2011 |
Ground Delay Program Planning Under Uncertainty Based on the Ration-by-Distance Principle | 12 | 0.78 | 2010 |
Toward Robust Revenue Management: Competitive Analysis of Online Booking | 43 | 2.15 | 2009 |
Matchings in connection with ground delay program planning | 2 | 0.45 | 2009 |
Revenue Management with Limited Demand Information | 27 | 1.18 | 2008 |
Slot Trading Opportunities in Collaborative Ground Delay Programs | 17 | 1.33 | 2006 |
Design of the federal express large package sort facility | 2 | 0.44 | 2006 |
Optimization-Based Available-To-Promise with Multi-Stage Resource Availability | 17 | 1.42 | 2005 |
Next generation satellite systems for aeronautical communications | 3 | 0.48 | 2004 |
Introduction to the Special Issue on Aviation Operations Research: Commemorating 100 Years of Aviation | 1 | 0.37 | 2003 |
A Stochastic Integer Program with Dual Network Structure and Its Application to the Ground-Holding Problem | 19 | 1.87 | 2003 |
Material compatibility constraints for make-to-order production planning | 5 | 1.23 | 2003 |
Models for the design and analysis of a large package sort facility | 5 | 0.80 | 2002 |
Supply chain infrastructures: system integration and information sharing | 13 | 0.84 | 2002 |
Quantity and Due Date Quoting Available to Promise | 21 | 2.60 | 2001 |
Fault-Tolerant Virtual Path Layout in ATM Networks | 6 | 0.48 | 2001 |
Generating and evaluating designs and plans for microwave modules | 2 | 0.55 | 2000 |
A Comparison of Formulations for the Single-Airport Ground-Holding Problem with Banking Constraints | 14 | 2.16 | 2000 |
The Rollon--Rolloff Vehicle Routing Problem | 31 | 3.26 | 2000 |
Integrated product and process designenvironment tool for manufacturing T/R modules. | 2 | 0.45 | 1998 |
Two-path subsets: efficient counting and applications to performability analysis | 1 | 0.42 | 1998 |
Managing Operations Research Models for Decision Support Systems Applications in a Database Environment | 2 | 0.35 | 1997 |
Distributed Call Rerouting in Multiclass Broadband Networks | 1 | 0.36 | 1995 |
Reliability, covering and balanced matrices | 1 | 0.61 | 1995 |
Network Flows (R. K. Ahuja, T. L. Magnanti and J. B. Orlin) | 0 | 0.34 | 1995 |
Threshold Reliability Of Networks With Small Failure Sets | 5 | 0.61 | 1995 |
Bounding a probability measure over a polymatroid with an application to transportation problems | 0 | 0.34 | 1994 |
Design f the MANDATE MIB | 4 | 0.98 | 1993 |
A reliability model applied to emergency service vehicle location | 67 | 6.04 | 1993 |
Matching Problems With Generalized Upper Bound Side Constraints | 7 | 0.93 | 1990 |
Sequencing of insertions in printed circuit board assembly | 81 | 12.15 | 1988 |
Disjoint products and efficient computation of reliability | 34 | 3.25 | 1988 |
An Analysis Of Alternative Strategies For Implementing Matching Algorithms | 28 | 12.31 | 1983 |
The Complexity Of Counting Cuts And Of Computing The Probability That A Graph Is Connected | 318 | 37.63 | 1983 |
Calculating Bounds On Reachability And Connectedness In Stochastic Networks | 50 | 15.61 | 1983 |
Current And Future-Research Directions In Network Optimization | 8 | 1.74 | 1981 |
Complexity Of Network Reliability Computations | 64 | 25.69 | 1980 |