Name
Papers
Collaborators
JAY H. LEE
55
102
Citations 
PageRank 
Referers 
501
80.37
1067
Referees 
References 
502
230
Search Limit
1001000
Title
Citations
PageRank
Year
CFD analysis and scale up of a baffled membrane reactor for hydrogen production by steam methane reforming00.342022
RD-toolbox: A computer aided toolbox for integrated design and control of reactive distillation processes00.342022
Multiscale modeling of fiber deformation: Application to a batch pulp digester for model predictive control of fiber strength00.342022
Forty Years Of Computers & Chemical Engineering: A Bibliometric Analysis (Vol 141, 106978, 2021)00.342021
Reinforcement learning for batch process control: Review and perspectives00.342021
Multi-Scale Fluid Dynamics Simulation Based On Mp-Pic-Pbe Method For Pmma Suspension Polymerization00.342021
Process Systems Engineering - The Generation Next?00.342021
Reinforcement Learning Based Optimal Control Of Batch Processes Using Monte-Carlo Deep Deterministic Policy Gradient With Phase Segmentation00.342021
Modeling, Simulation And Optimization Of The Rotating Packed Bed (Rpb) Absorber And Stripper For Mea-Based Carbon Capture00.342020
Forty years of computers & chemical engineering: A bibliometric analysis00.342020
Multi-Phase Particle-In-Cell Coupled with Population Balance Equation (MP-PIC-PBE) Method for Multiscale Computational Fluid Dynamics Simulation00.342020
An investigation into the hydrodynamics of a spinning cone column: CFD simulations by an Eulerian-Lagrangian approach.00.342020
Dynamic analysis and linear model predictive control for operational flexibility of post-combustion CO capture processes.00.342020
Multi-objective optimization of operation of lignocellulosic acetone-butanol-ethanol fermentation with ex situ butanol recovery (ESBR).00.342020
Multi-timescale, multi-period decision-making model development by combining reinforcement learning and mathematical programming20.532019
Reinforcement Learning - Overview of recent progress and implications for process control.20.432019
Integrated scheduling of vessel dispatching and port operations in the closed-loop shipping system for transporting petrochemicals.10.372019
Parallel neural networks for improved nonlinear principal component analysis00.342019
A model-based optimization of microalgal cultivation strategies for lipid production under photoautotrophic condition00.342019
Optimal design of heat and water recovery system utilizing waste flue gases for refinery CO reduction.00.342019
Improved Parameter Estimation Of Ill-Conditioned Problems00.342018
An optimization based strategy for crude selection in a refinery with lube hydro-processing.00.342018
Integrating operations and control: A perspective and roadmap for future research.10.482018
Machine learning: Overview of the recent progresses and implications for the process systems engineering field.120.732018
New performance indicators for adsorbent evaluation derived from a reduced order model of an idealized PSA process for CO2 capture.00.342017
Optimal design for flexible operation of the post-combustion CO2 capture plant with uncertain economic factors.00.342016
A methodology for the sustainable design and implementation strategy of CO2 utilization processes.00.342016
Stochastic Optimization With Value Function Approximation For Micro-Grid Operation00.342016
Multi-time scale procurement planning considering multiple suppliers and uncertainty in supply and demand.30.412016
Optimization of the various modes of flexible operation for post-combustion CO2 capture plant.00.342015
Optimal processing pathway selection for microalgae-based biorefinery under uncertainty00.342015
Two stage stochastic bilevel programming model of a pre-established timberlands supply chain with biorefinery investment interests.60.462015
Fast moving horizon estimation for a two-dimensional distributed parameter system.20.372014
Sparse identification in chemical master equations for monomolecular reaction networks00.342014
Analysis and comparison of single period single level and bilevel programming representations of a pre-existing timberlands supply chain with a new biorefinery facility.30.412014
Optimal processing pathway for the production of biodiesel from microalgal biomass: A superstructure based approach.30.482013
Genome-scale metabolic model of the fission yeast Schizosaccharomyces pombe and the reconciliation of in silico/in vivo mutant growth.30.392012
Optimal design and global sensitivity analysis of biomass supply chain networks for biofuels under uncertainty473.122011
Controlled exploration of state space in off-line ADP and its application to stochastic shortest path problems00.342009
Approximate dynamic programming based approach to process control and scheduling140.882006
Identifying the interacting positions of a protein using Boolean learning and support vector machines.10.372006
Approximate dynamic programming-based approaches for input-output data-driven control of nonlinear processes221.552005
An algorithmic framework for improving heuristic solutions: Part II. A new version of the stochastic traveling salesman problem80.852004
An introduction to a dynamic plant-wide optimization strategy for an integrated plant175.022004
Dynamic programming in a heuristically confined state space: a stochastic resource-constrained project scheduling application261.172004
An algorithmic framework for improving heuristic solutions: Part I. A deterministic discount coupon traveling salesman problem61.062004
On the use of constraints in least squares estimation and control183.452002
Brief Constrained linear state estimation-a moving horizon approach1279.612001
Brief Control-relevant experiment design for multivariable systems described by expansions in orthonormal bases142.442001
Model-based iterative learning control with a quadratic criterion for time-varying linear systems9410.322000
  • 1
  • 2