Name
Affiliation
Papers
JONATHAN F. BARD
Graduate Program in Operations Research and Industrial Engineering, 1 University Station C2200, The University of Texas, Austin, Tx 78712-0292, USA
72
Collaborators
Citations 
PageRank 
79
1428
144.29
Referers 
Referees 
References 
2228
735
540
Search Limit
1001000
Title
Citations
PageRank
Year
Risk-averse stochastic bilevel programming: An application to natural gas markets00.342022
Strategic interactions between liquefied natural gas and domestic gas markets: A bilevel model00.342022
Workforce capacity planning with hierarchical skills, long-term training, and random resignations00.342022
The flexible break assignment problem for large tour scheduling problems with an application to airport ground handlers00.342020
Hierarchy Machine Set-Up For Multi-Pass Lot Scheduling At Semiconductor Assembly And Test Facilities10.352019
An exact algorithm for designing optimal districts in the collection of waste electric and electronic equipment through an improved reformulation00.342019
A performance analysis of dispatch rules for semiconductor assembly & test operations00.342019
Extended open shop scheduling with resource constraints: Appointment scheduling for integrated practice units10.352019
A stochastic optimization approach to shift scheduling with breaks adjustments.00.342019
Using simulation to Design a Worklife Integrated Practice Unit.00.342018
Controlling Work In Process During Semiconductor Assembly And Test Operations10.352017
Benders decomposition and an IP-based heuristic for selecting IMRT treatment beam angles.10.362016
Annual block scheduling for internal medicine residents with 4+1 templates.00.342016
The Destination-Loader-Door Assignment Problem for Automated Package Sorting Centers50.522016
A Branch-and-Price-and-Cut Algorithm for Heterogeneous Pickup and Delivery Problems with Configurable Vehicle Capacity80.452015
Improving performance of dispatch rules for daily scheduling of assembly and test operations40.462015
Optimization of multi-fleet aircraft routing considering passenger transiting under airline disruption40.422015
A sequential GRASP for the therapist routing and scheduling problem30.402014
Flexible weekly tour scheduling for postal service workers using a branch and price70.502013
A simulation analysis of a patient-centered surgical home to improve outpatient surgical processes of care and outcomes.00.342013
A GRASP for simultaneously assigning and sequencing product families on flexible assembly lines.20.382013
A GRASP with adaptive large neighborhood search for pickup and delivery problems with transshipment60.452012
Large-scale pickup and delivery work area design90.482012
A reactive GRASP with path relinking for capacitated clustering220.892011
Pickup and delivery network segmentation using contiguous geographic clustering.40.402011
A branch-and-price algorithm for an integrated production and inventory routing problem391.142010
Validating vehicle routing zone construction using Monte Carlo simulation70.502010
Heuristics for a multiperiod inventory routing problem with production decisions251.142009
The integrated production---inventory---distribution---routing problem391.372009
Workforce Design with Movement Restrictions Between Workstation Groups80.542008
A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs171.352008
A two-stage stochastic programming approach for project planning with uncertain activity durations120.742007
Cyclic preference scheduling of nurses using a Lagrangian-based heuristic321.272007
Workforce planning at USPS mail processing and distribution centers using stochastic optimization210.942007
Comparative approaches to equipment scheduling in high volume factories20.422006
A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem461.472006
Generating labor requirements and rosters for mail handlers using simulation and optimization60.482006
The task assignment problem for unrestricted movement between workstation groups60.502006
A multi-period machine assignment problem30.442006
Preference scheduling for nurses using column generation893.342005
A GRASP for Parallel Machine Scheduling with Time Windows100.712005
Selecting the appropriate input data set when configuring a permanent workforce80.662004
Class Scheduling for Pilot Training40.522004
A Bundle Algorithm Approach for the Aircraft Schedule Recovery Problem During Hub Closures100.812003
Staff scheduling at the United States postal service422.582003
The Flow Shop Scheduling Polyhedron with Setup Time40.672003
A Branch-and-Cut Procedure for the Vehicle Routing Problem with Time Windows452.442002
Delivery Cost Approximations for Inventory Routing Problems in a Rolling Horizon Framework311.982002
Single machine scheduling with assignable due dates171.592002
A bilevel programming approach to determining tax credits for biofuel production281.662000
  • 1
  • 2