Name
Playground
About
FAQ
GitHub
Playground
Shortest Path Finder
Community Detector
Connected Papers
Author Trending
Vincent Aleven
Tidjani Négadi
Keith A. Butler
Kazuki Shibata
Jhonathan Pinzon
Liangliang Shang
Giovanni Venturelli
Chen Ma
Jing-Sheng Wong
Radu Timofte
Home
/
Author
/
JONATHAN F. BARD
Author Info
Open Visualization
Name
Affiliation
Papers
JONATHAN F. BARD
Graduate Program in Operations Research and Industrial Engineering, 1 University Station C2200, The University of Texas, Austin, Tx 78712-0292, USA
72
Collaborators
Citations
PageRank
79
1428
144.29
Referers
Referees
References
2228
735
540
Search Limit
100
1000
Publications (72 rows)
Collaborators (79 rows)
Referers (100 rows)
Referees (100 rows)
Title
Citations
PageRank
Year
Risk-averse stochastic bilevel programming: An application to natural gas markets
0
0.34
2022
Strategic interactions between liquefied natural gas and domestic gas markets: A bilevel model
0
0.34
2022
Workforce capacity planning with hierarchical skills, long-term training, and random resignations
0
0.34
2022
The flexible break assignment problem for large tour scheduling problems with an application to airport ground handlers
0
0.34
2020
Hierarchy Machine Set-Up For Multi-Pass Lot Scheduling At Semiconductor Assembly And Test Facilities
1
0.35
2019
An exact algorithm for designing optimal districts in the collection of waste electric and electronic equipment through an improved reformulation
0
0.34
2019
A performance analysis of dispatch rules for semiconductor assembly & test operations
0
0.34
2019
Extended open shop scheduling with resource constraints: Appointment scheduling for integrated practice units
1
0.35
2019
A stochastic optimization approach to shift scheduling with breaks adjustments.
0
0.34
2019
Using simulation to Design a Worklife Integrated Practice Unit.
0
0.34
2018
Controlling Work In Process During Semiconductor Assembly And Test Operations
1
0.35
2017
Benders decomposition and an IP-based heuristic for selecting IMRT treatment beam angles.
1
0.36
2016
Annual block scheduling for internal medicine residents with 4+1 templates.
0
0.34
2016
The Destination-Loader-Door Assignment Problem for Automated Package Sorting Centers
5
0.52
2016
A Branch-and-Price-and-Cut Algorithm for Heterogeneous Pickup and Delivery Problems with Configurable Vehicle Capacity
8
0.45
2015
Improving performance of dispatch rules for daily scheduling of assembly and test operations
4
0.46
2015
Optimization of multi-fleet aircraft routing considering passenger transiting under airline disruption
4
0.42
2015
A sequential GRASP for the therapist routing and scheduling problem
3
0.40
2014
Flexible weekly tour scheduling for postal service workers using a branch and price
7
0.50
2013
A simulation analysis of a patient-centered surgical home to improve outpatient surgical processes of care and outcomes.
0
0.34
2013
A GRASP for simultaneously assigning and sequencing product families on flexible assembly lines.
2
0.38
2013
A GRASP with adaptive large neighborhood search for pickup and delivery problems with transshipment
6
0.45
2012
Large-scale pickup and delivery work area design
9
0.48
2012
A reactive GRASP with path relinking for capacitated clustering
22
0.89
2011
Pickup and delivery network segmentation using contiguous geographic clustering.
4
0.40
2011
A branch-and-price algorithm for an integrated production and inventory routing problem
39
1.14
2010
Validating vehicle routing zone construction using Monte Carlo simulation
7
0.50
2010
Heuristics for a multiperiod inventory routing problem with production decisions
25
1.14
2009
The integrated production---inventory---distribution---routing problem
39
1.37
2009
Workforce Design with Movement Restrictions Between Workstation Groups
8
0.54
2008
A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs
17
1.35
2008
A two-stage stochastic programming approach for project planning with uncertain activity durations
12
0.74
2007
Cyclic preference scheduling of nurses using a Lagrangian-based heuristic
32
1.27
2007
Workforce planning at USPS mail processing and distribution centers using stochastic optimization
21
0.94
2007
Comparative approaches to equipment scheduling in high volume factories
2
0.42
2006
A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem
46
1.47
2006
Generating labor requirements and rosters for mail handlers using simulation and optimization
6
0.48
2006
The task assignment problem for unrestricted movement between workstation groups
6
0.50
2006
A multi-period machine assignment problem
3
0.44
2006
Preference scheduling for nurses using column generation
89
3.34
2005
A GRASP for Parallel Machine Scheduling with Time Windows
10
0.71
2005
Selecting the appropriate input data set when configuring a permanent workforce
8
0.66
2004
Class Scheduling for Pilot Training
4
0.52
2004
A Bundle Algorithm Approach for the Aircraft Schedule Recovery Problem During Hub Closures
10
0.81
2003
Staff scheduling at the United States postal service
42
2.58
2003
The Flow Shop Scheduling Polyhedron with Setup Time
4
0.67
2003
A Branch-and-Cut Procedure for the Vehicle Routing Problem with Time Windows
45
2.44
2002
Delivery Cost Approximations for Inventory Routing Problems in a Rolling Horizon Framework
31
1.98
2002
Single machine scheduling with assignable due dates
17
1.59
2002
A bilevel programming approach to determining tax credits for biofuel production
28
1.66
2000
1
2
50 / page