Name
Affiliation
Papers
XIN-BAO LIU
School of Management, Hefei University of Technology, Hefei, China
62
Collaborators
Citations 
PageRank 
89
254
26.14
Referers 
Referees 
References 
424
1095
801
Search Limit
1001000
Title
Citations
PageRank
Year
A hybrid metaheuristic for a semiconductor production scheduling problem with deterioration effect and resource constraints00.342022
A game of information security investment considering security insurance and complementary information assets00.342022
A three-level consensus model for large-scale multi-attribute group decision analysis based on distributed preference relations under social network analysis00.342022
Ridesharing in urban areas: multi-objective optimisation approach for ride-matching and routeing with commuters' dynamic mode choice00.342022
A modified variable neighborhood search algorithm for manufacturer selection and order acceptance in distributed virtual manufacturing network00.342022
Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines00.342021
Integrated Inventory And Production Policy For Manufacturing With Perishable Raw Materials00.342021
A Variable Neighborhood Search Approach For The Resource-Constrained Multi-Project Collaborative Scheduling Problem00.342021
Remaining Useful Life Prediction For Aircraft Engines Based On Phase Space Reconstruction And Hybrid Vns-Svr Model00.342021
Effects of resource occupation and decision authority decentralisation on performance of the IoT-based virtual enterprise in central China00.342021
A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities30.452021
Parallel-Machine Serial-Batching Scheduling With Release Times Under The Effects Of Position-Dependent Learning And Time-Dependent Deterioration10.352021
Weight assignment method for multiple attribute decision making with dissimilarity and conflict of belief distributions20.362020
Parallel-batching machines scheduling problem with a truncated time-dependent learning effect via a hybrid CS-JADE algorithm00.342020
A BRKGA-DE algorithm for parallel-batching scheduling with deterioration and learning effects on parallel machines under preventive maintenance consideration10.352020
Less Is More: Variable Neighborhood Search For Integrated Production And Assembly In Smart Manufacturing10.362020
Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent20.632020
Parallel-batching scheduling with nonlinear processing times on a single and unrelated parallel machines10.352020
A Robust Optimization Approach For Integrated Steel Production And Batch Delivery Scheduling With Uncertain Rolling Times And Deterioration Effect00.342020
Parallel-batching scheduling of deteriorating jobs with non-identical sizes and rejection on a single machine10.362020
Robust parallel-batching scheduling with fuzzy deteriorating processing time and variable delivery time in smart manufacturing00.342020
Solving the traveling repairman problem with profits: A Novel variable neighborhood search approach.10.352020
Single-machine and parallel-machine serial-batching scheduling problems with position-based learning effect and linear setup time.60.432019
Two-stage hybrid flow shop scheduling on parallel batching machines considering a job-dependent deteriorating effect and non-identical job sizes.20.362019
Evidential reasoning approach with multiple kinds of attributes and entropy-based weight assignment.60.412019
Information security decisions for two firms in a market with different types of customers.00.342019
The Effect Of Yield Rate In A General Price-Setting Newsvendor Model With A Yield-Dependent Secondary Market00.342019
Replacement and inventory control for a multi-customer product service system with decreasing replacement costs.00.342019
A hybrid ABC-TS algorithm for the unrelated parallel-batching machines scheduling problem with deteriorating jobs and maintenance activity.100.492018
A New Game Of Information Sharing And Security Investment Between Two Allied Firms00.342018
Evidential reasoning rule for MADM with both weights and reliabilities in group decision making.140.462018
Closed-loop supply chain inventory management with recovery information of reusable containers20.352018
Security investment and information sharing in the market of complementary firms: impact of complementarity degree and industry size.00.342018
A Hybrid Vns-Hs Algorithm For A Supply Chain Scheduling Problem With Deteriorating Jobs90.462018
Serial-batching group scheduling with release times and the combined effects of deterioration and truncated job-dependent learning.90.462018
Evidential reasoning approach for MADM based on incomplete interval value.50.382017
A study on decision making of cutting stock with frustum of cone bars30.432017
Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine140.572017
A game-theoretic analysis of information security investment for multiple firms in a network.30.382017
Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times180.602017
Real options approach to explore the effect of organizational change on IoT development project.00.342017
Single-machine serial-batching scheduling with a machine availability constraint, position-dependent processing time, and time-dependent set-up time.50.422017
Optimal production planning in a hybrid manufacturing and recovering system based on the internet of things with closed loop supply chains.40.422016
Scheduling jobs on a single serial-batching machine with dynamic job arrivals and multiple job types10.362016
Solving a supply chain scheduling problem with non-identical job sizes and release times by applying a novel effective heuristic algorithm70.602016
An evidential reasoning based multiple attribute decision making approach under fixed attributes00.342015
Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan.281.012015
Preemptive scheduling in a two-stage supply chain to minimize the makespan20.372015
Single machine serial-batching scheduling with independent setup time and deteriorating job processing times.70.482015
Security and Privacy Analysis of Tree-LSHB+ Protocol40.392014
  • 1
  • 2