Static job scheduling for environments with vertical elasticity | 1 | 0.37 | 2020 |
Managing Vertical Memory Elasticity in Containers | 0 | 0.34 | 2020 |
Combining VM Preemption Schemes to Improve Vertical Memory Elasticity Scheduling in Clouds | 1 | 0.37 | 2018 |
Affinity aware scheduling model of cluster nodes in private clouds. | 2 | 0.42 | 2017 |
MEC: The Memory Elasticity Controller | 0 | 0.34 | 2016 |
An Autonomic Parallel Strategy for the Projection of Ecological Niche Models in Heterogeneous Computational Environments. | 0 | 0.34 | 2016 |
Evaluating the Impact of Memory Allocation and Swap for Vertical Memory Elasticity in VMs | 1 | 0.36 | 2015 |
Supporting biodiversity studies with the EUBrazilOpenBio Hybrid Data Infrastructure. | 4 | 0.43 | 2015 |
Improving Memory Hierarchy Utilisation for Stencil Computations on Multicore Machines. | 1 | 0.35 | 2013 |
EU-Brazil Open Data and Cloud Computing e-Infrastructure for Biodiversity. | 1 | 0.35 | 2013 |
Latest trends in computer architectures and parallel and distributed technologies. | 0 | 0.34 | 2013 |
A hybrid fault tolerance scheme for EasyGrid MPI applications | 0 | 0.34 | 2011 |
A Distributed And Hierarchical Strategy For Autonomic Grid-Enabled Cooperative Metaheuristics With Applications | 0 | 0.34 | 2011 |
A Simple Architecture for Digital Games on Demand Using Low Performance Resources under a Cloud Computing Paradigm. | 7 | 0.66 | 2010 |
On the Feasibility of Dynamically Scheduling DAG Applications on Shared Heterogeneous Systems | 1 | 0.35 | 2009 |
EasyGrid Enabling of Iterative Tightly-Coupled Parallel MPI Applications | 6 | 0.45 | 2008 |
Autonomic application management for large scale MPI programs | 1 | 0.36 | 2008 |
Dynamic self-scheduling for parallel applications with task dependencies | 10 | 0.59 | 2008 |
MOS-Based Rate Adaption for VoIP Sources | 6 | 0.52 | 2007 |
Low cost self-healing in MPI applications | 2 | 0.38 | 2007 |
Distributed And Dynamic Self-Scheduling Of Parallel Mpi Grid Applications | 9 | 0.60 | 2007 |
An EasyGrid portal for scheduling system-aware applications on computational Grids. | 0 | 0.34 | 2006 |
adaMOS: MOS-adaptive VoIP sources | 0 | 0.34 | 2006 |
Efficient hierarchical self-scheduling for MPI applications executing in computational Grids | 4 | 0.43 | 2005 |
Easygrid: Towards A Framework For The Automatic Grid Enabling Of Legacy Mpi Applications | 21 | 0.95 | 2004 |
A tool for the design and evaluation of hybrid scheduling algorithms for computational grids | 2 | 0.40 | 2004 |
EasyGrid: Towards a Framework for the Automatic Grid Enabling of MPI Applications | 4 | 0.50 | 2003 |
Towards Optimal Static Task Scheduling for Realistic Machine Models: Theory and Practice | 6 | 0.56 | 2003 |
On Minimising the Processor Requirements of LogP Schedules | 2 | 0.37 | 2001 |
On the Design of Clustering-based Scheduling Algorithms for Realistic Machine Models | 5 | 0.51 | 2001 |
A versatile cost modelling approach for multicomputer task scheduling | 9 | 0.67 | 1999 |
Scheduling Arbitrary Task Graphs on LogP Machines | 3 | 0.40 | 1999 |
Cluster-Based Task Scheduling for the LOGP Model | 6 | 0.59 | 1999 |
Towards an Effective Task Clustering Heuristic for LogP Machines | 0 | 0.34 | 1999 |
Static Scheduling Using Task Replication for LogP and BSP Models | 6 | 0.49 | 1998 |
Versatile Task Scheduling of Binary Trees for Realistic Machines | 4 | 0.44 | 1997 |
On the Performance Evaluation of Fully Asynchronous Processor Architectures | 2 | 0.38 | 1995 |