Value Depreciation Factors For New And Remanufactured High-Technology Products: A Case Study On Iphones And Ipads | 0 | 0.34 | 2020 |
Trade-In-To-Upgrade As A Marketing Strategy In Disassembly-To-Order Systems At The Edge Of Blockchain Technology | 0 | 0.34 | 2020 |
An Intelligent Multiattribute Group Decision-Making Approach With Preference Elicitation for Performance Evaluation | 2 | 0.40 | 2020 |
Predictive analysis of electronic waste for reverse logistics operations: a comparison of improved univariate grey models | 0 | 0.34 | 2020 |
Collaboration Strategy For A Decentralized Supply Chain Using Linear Physical Programming | 0 | 0.34 | 2020 |
A Robust Robotic Disassembly Sequence Design Using Orthogonal Arrays and Task Allocation. | 2 | 0.36 | 2019 |
Disassembly Line Balancing Problem: A Review Of The State Of The Art And Future Directions | 9 | 0.45 | 2019 |
A Decision Maker-Centered End-of-Life Product Recovery System for Robot Task Sequencing. | 2 | 0.39 | 2018 |
Modeling and Analysis of a Closed-Loop Supply Chain in Consideration of Extra Demand. | 0 | 0.34 | 2018 |
Analysis Of Product Designs For Product Recovery Using Linear Physical Programming | 0 | 0.34 | 2018 |
A holistic approach for performance evaluation using quantitative and qualitative data: A food industry case study. | 0 | 0.34 | 2017 |
Design of a Closed-Loop Supply Chain with Stochastic Product Returns. | 0 | 0.34 | 2017 |
A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem | 22 | 0.91 | 2016 |
Base and Extended One-Dimensional Warranties Analyses for Remanufactured Products. | 0 | 0.34 | 2016 |
Disassembly Sequencing Using Tabu Search. | 9 | 0.59 | 2016 |
Fuzzy Linear Physical Programming For Multiple Criteria Decision-Making Under Uncertainty | 1 | 0.36 | 2016 |
A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system. | 12 | 0.68 | 2014 |
Quality management in product recovery using the Internet of Things: An optimization approach | 15 | 0.90 | 2014 |
Optimization of a Reverse Manufacturing System with Multiple Virtual Inventories. | 1 | 0.35 | 2013 |
Simulated Annealing Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem. | 6 | 0.51 | 2013 |
Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem. | 17 | 0.75 | 2013 |
Optimal End-of-Life Management in Closed-Loop Supply Chains Using RFID and Sensors | 10 | 0.55 | 2012 |
A Robotic-Driven Disassembly Sequence Generator for End-Of-Life Electronic Products | 15 | 0.88 | 2012 |
Metrics and experimental data for assessing unbalanced disassembly lines. | 2 | 0.41 | 2011 |
Near optimal buffer allocation in remanufacturing systems with N-policy | 5 | 0.46 | 2010 |
Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line | 9 | 0.65 | 2010 |
A multiple objective tabu search approach for end-of-life product disassembly | 7 | 0.55 | 2009 |
Solving the disassembly-to-order problem using linear physical programming | 10 | 0.78 | 2009 |
Metrics for performance measurement of a reverse/closed-loop supply chain | 7 | 0.60 | 2009 |
A path-relinking approach for a bi-criteria disassembly sequencing problem | 20 | 1.04 | 2008 |
A balancing method and genetic algorithm for disassembly line balancing | 48 | 3.13 | 2007 |
Buffer allocation plan for a remanufacturing cell | 9 | 1.90 | 2005 |
Greedy algorithm for disassembly line scheduling | 3 | 0.45 | 2003 |
Performance evaluation of a supplier management system with stochastic variability | 1 | 0.65 | 2003 |
A case-based reasoning approach for automating disassembly process planning | 19 | 1.44 | 2002 |
Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships | 22 | 2.40 | 2001 |
Production systems with interruptions, arbitrary topology and finite buffers | 7 | 0.80 | 2000 |
Expansion method for the throughput analysis of open finite manufacturing/queueing networks with N-policy | 4 | 0.70 | 1999 |
Analysis Of Manufacturing Flow Lines With Unreliable Machines | 1 | 0.52 | 1999 |
Machine interference problem with warm spares, server vacations and exhaustive service | 13 | 0.85 | 1997 |
Duality relations for queues with arrival and service control | 3 | 0.49 | 1997 |
Interrelationship between controlling arrival and service in queueing systems | 9 | 0.77 | 1995 |
Queueing model with state dependent balking and reneging: its complementary and equivalence | 1 | 0.39 | 1995 |
Solution to complex queueing systems: a spreadsheet approach | 1 | 0.40 | 1994 |
Complementarity and equivalence in finite source queueing models with spares | 5 | 0.77 | 1994 |