Critical Activity Effect on Project Duration in Precedence Diagram Method Scheduling Network. | 0 | 0.34 | 2015 |
Effective designation of specific shots on video service system utilizing Mahalanobis distance | 4 | 0.74 | 2005 |
Video service utilizing networked image retrieval system | 3 | 0.80 | 2002 |
HD image retrieval utilizing networked image directory | 2 | 0.53 | 2002 |
Hybrid monitoring system for high temperature gas cooling reactor | 0 | 0.34 | 1999 |
A Distributed Control For Hyper Redundant Manipulator. | 4 | 0.85 | 1992 |
High-speed Si-bipolar IC design for multi-Gb/s optical receivers | 0 | 0.34 | 1991 |
Nucleotide sequence of 5S ribosomal RNA from Rhodococcus erythropolis. | 0 | 0.34 | 1987 |
Master slice LSI Computer Aided Design system | 0 | 0.34 | 1974 |