Abstract | ||
---|---|---|
We give a counterexample to show that the optimality proof by Kise et al. (1978) for an algorithm for a scheduling problem is incorrect. |
Year | DOI | Venue |
---|---|---|
2010 | 10.1287/opre.1090.0749 | Operations Research |
Keywords | Field | DocType |
kise-ibaraki-mine algorithm,optimality proof,scheduling problem,algorithm,production scheduling | Mathematical optimization,Job shop scheduling,Algorithm,Scheduling (production processes),Counterexample,Mathematics | Journal |
Volume | Issue | ISSN |
58 | 2 | 0030-364X |
Citations | PageRank | References |
3 | 0.63 | 2 |
Authors | ||
3 |
Name | Order | Citations | PageRank |
---|---|---|---|
Shanlin Li | 1 | 5 | 1.62 |
Zhi-Long Chen | 2 | 414 | 26.32 |
Guochun Tang | 3 | 109 | 11.39 |