Title
Dynamic co-operative scheduling based on HLA
Abstract
In an advanced factory, higher and higher flexibility is required to meet a great variety of customers' requirements. In this environment, a dynamic management architecture is required for distributed production system. In this paper, a newly distributed simulation architecture called HLA (High Level Architecture) is utilized to achieve a distributed scheduling simulation for dynamic work assignment and flexible working group configuration in a distributed production system. It is verified that the distributed scheduling simulation based on HLA is effective to achieve higher flexibility for a distributed production system, by some case studies.
Year
DOI
Venue
2002
10.1007/0-387-23572-2_33
INTERNATIONAL FEDERATION FOR INFORMATION PROCESSING
Keywords
Field
DocType
HLA dynamic scheduling,distributed simulation,intelligent and distributed production system
Fixed-priority pre-emptive scheduling,Fair-share scheduling,Computer science,Deadline-monotonic scheduling,Two-level scheduling,Rate-monotonic scheduling,Dynamic priority scheduling,Round-robin scheduling,High-level architecture,Distributed computing
Conference
Volume
ISSN
Citations 
168
1571-5736
2
PageRank 
References 
Authors
0.46
0
4
Name
Order
Citations
PageRank
Keiichi Shirase11013.56
Hidefumi Wakamatsu215519.11
Akira Tsumaya3244.58
Eiji Arai48417.87