Abstract | ||
---|---|---|
In an advanced factory, higher and higher flexibility is required to meet a great variety of customers' requirements. In this environment, a dynamic management architecture is required for distributed production system. In this paper, a newly distributed simulation architecture called HLA (High Level Architecture) is utilized to achieve a distributed scheduling simulation for dynamic work assignment and flexible working group configuration in a distributed production system. It is verified that the distributed scheduling simulation based on HLA is effective to achieve higher flexibility for a distributed production system, by some case studies. |
Year | DOI | Venue |
---|---|---|
2002 | 10.1007/0-387-23572-2_33 | INTERNATIONAL FEDERATION FOR INFORMATION PROCESSING |
Keywords | Field | DocType |
HLA dynamic scheduling,distributed simulation,intelligent and distributed production system | Fixed-priority pre-emptive scheduling,Fair-share scheduling,Computer science,Deadline-monotonic scheduling,Two-level scheduling,Rate-monotonic scheduling,Dynamic priority scheduling,Round-robin scheduling,High-level architecture,Distributed computing | Conference |
Volume | ISSN | Citations |
168 | 1571-5736 | 2 |
PageRank | References | Authors |
0.46 | 0 | 4 |
Name | Order | Citations | PageRank |
---|---|---|---|
Keiichi Shirase | 1 | 10 | 13.56 |
Hidefumi Wakamatsu | 2 | 155 | 19.11 |
Akira Tsumaya | 3 | 24 | 4.58 |
Eiji Arai | 4 | 84 | 17.87 |