Title
Research on Risk in Long-Term Reservoir Dynamic Probability Scheduling
Abstract
This paper presents the concept of engineering risk, the algorithm of mean first order second moment (MFOSM) and the approach for long-term reservoir dynamic probability scheduling (LRDPS). MFOSM is applied to study the current stage risk in LRDPS and the risk analysis model is built up for corresponding annual scheduling. Tested in Dan Jiangkou plant, which belongs to Central China Power Grid, the experiment shows that the approach is feasible and can be the assistance of scheduling decision.
Year
DOI
Venue
2007
10.1109/ICNC.2007.629
ICNC
Keywords
Field
DocType
risk analysis model,central china power grid,engineering risk,long-term reservoir,dynamic probability scheduling,dan jiangkou plant,current stage risk,long-term reservoir dynamic probability,corresponding annual scheduling,dynamic scheduling,risk analysis,reservoirs,probability
Mathematical optimization,First order,Risk analysis (business),Computer science,Scheduling (computing),Power grid,Dynamic priority scheduling,Second moment of area
Conference
Volume
ISSN
ISBN
5
2157-9555
0-7695-2875-9
Citations 
PageRank 
References 
0
0.34
0
Authors
3
Name
Order
Citations
PageRank
Cailin Li101.35
Huijun Xu272.87
Xiao-Hui Yuan353475.44