Title
Correspondence of activity relationships and critical path between time-location diagrams and CPM
Abstract
Various methods for identifying the critical path in linear schedules have been proposed over the last years. Work done in comparing these methods has shown that in many activity configurations, their results do not coincide. This paper attempts a critical path comparison between the linear scheduling method KLRPM, developed by the authors, and the network scheduling method CPM. In order to achieve this comparison, a correspondence between activity relationships of the CPM and the KLRPM is established first. The results of the two methods are then tested for some simple activity configurations and applied on an illustrative example taken from the literature. The results are commented and recommendations for further research are proposed.
Year
DOI
Venue
2004
10.1007/BF02944146
Operational Research
Keywords
DocType
Volume
critical path method,time-location diagrams,linear projects
Journal
4
Issue
ISSN
Citations 
3
1866-1505
0
PageRank 
References 
Authors
0.34
0
2
Name
Order
Citations
PageRank
Alexandros Kallantzis100.34
Sergios Lambropoulos282.96