Title | ||
---|---|---|
Multi agent architecture for dynamic incremental process planning in the flexible manufacturing system |
Abstract | ||
---|---|---|
Due to rapid changes of markets and pressures of competitions, industries are adopting their production ways to support diversity
of customer’s needs and increase of new product developments. This paper deals with development of an agent-based architecture
of dynamic systems for process planning in the manufacturing systems. In consideration of alternative manufacturing processes
and machine tools, the process plans and the schedules of the manufacturing resources are generated incrementally and dynamically.
A previously proposed negotiation protocol is customized and improved to generate suitable process plans for the target products
real-timely and dynamically, based on the alternative manufacturing processes. The alternative manufacturing processes are
presented by the process plan networks and the suitable process plans are searched and generated to cope with both the dynamic
status and disturbances of the manufacturing systems. We initiatively combine the heuristic search algorithms of the process
plan networks with the negotiation protocols, in order to generate suitable process plans. |
Year | DOI | Venue |
---|---|---|
2010 | 10.1007/s10845-008-0206-1 | J. Intelligent Manufacturing |
Keywords | Field | DocType |
Flexible manufacturing system,Multi agent system,Process planning,Scheduling | Process development execution system,Computer-integrated manufacturing,Manufacturing engineering,Multi-agent system,Agent architecture,Schedule,Flexible manufacturing system,Engineering,Manufacturing execution system,New product development | Journal |
Volume | Issue | ISSN |
21 | 4 | 0956-5515 |
Citations | PageRank | References |
11 | 0.65 | 7 |
Authors | ||
4 |
Name | Order | Citations | PageRank |
---|---|---|---|
Hossein Tehrani Nik Nejad | 1 | 11 | 0.65 |
Nobuhiro Sugimura | 2 | 23 | 6.60 |
Koji Iwamura | 3 | 18 | 3.37 |
Yoshitaka Tanimizu | 4 | 17 | 3.74 |