Abstract | ||
---|---|---|
The Job-Shop Scheduling Problem is simplified from the shop production though it is NP-hard, and the actual Scheduling is
more complicated than it. The complex flexible manufacturing cell dynamic scheduling (FMCDS) which takes much disturb into
account is researched in. The machine may suddenly turn into malfunction during production, and the jobs may go into or be
canceled from scheduling for some reason. Each kind of part can be disintegrated into a lot of batch which includes some parts,
and batch operation can choice one from some machines. Furthermore, several objects are optimized, which include time, cost
and machine use rate. The FMCDS model is set up, and a dynamic evaluation based immune algorithm and rolling-disturb hybrid
rescheduling policy are initially brought forward to solve FMCDS. The proposed algorithm, policy and method are applied to
Xi’an Aviation Manufacture Corporation, and can fulfill its FMCDS.
|
Year | DOI | Venue |
---|---|---|
2006 | 10.1007/0-387-34403-9_124 | PROLAMAT |
Keywords | DocType | Citations |
flexible manufacturing cell dynamic scheduling,immune algorithm,temporary solution set. rolling-disturb hybrid rescheduling policy. | Conference | 0 |
PageRank | References | Authors |
0.34 | 1 | 2 |
Name | Order | Citations | PageRank |
---|---|---|---|
Shudong Sun | 1 | 361 | 28.11 |
Jinghui Hao | 2 | 0 | 1.01 |