Abstract | ||
---|---|---|
We propose a simple model of a production plant that is based on the ASEP and simulate the dependence of the lead time T on the lot size r. Then, we derive an analytical description of the simulation results based on exact results for the single-species ASEP. Furthermore, we determine the optimum lot size rc and investigate dependence of rc on several parameters used in the simulations. |
Year | DOI | Venue |
---|---|---|
2010 | 10.1007/978-3-642-15979-4_65 | ACRI |
Keywords | Field | DocType |
optimum lot size rc,simple model,lot size optimization,exact result,production plant,simulation result,lead time,lot size,single-species asep,analytical description,productivity enhancement | Asymmetric simple exclusion process,Mathematical optimization,Computer science,Lead time,Production line | Conference |
Volume | ISSN | ISBN |
6350 | 0302-9743 | 3-642-15978-8 |
Citations | PageRank | References |
0 | 0.34 | 1 |
Authors | ||
3 |
Name | Order | Citations | PageRank |
---|---|---|---|
Takumi Minemura | 1 | 0 | 0.34 |
Katsuhiro Nishinari | 2 | 189 | 47.27 |
Andreas Schadschneider | 3 | 121 | 24.37 |