Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan's Barcelona Plant
Abstract
In this paper, we present an extension to the mixed-model sequencing problem with work overload minimisation (MMSP-W) for production lines with serial workstations and parallel homogeneous processors. The extension is intended to meet the industrial need to sequence various products so that the work required and completed at the workstations over time is as constant as possible. Several approaches are proposed to formulate the problem, giving rise to different models. Four models are selected, and their performances are compared after running the Gurobi solver, using instances from the literature and a case study of the Nissan powertrain plant in Barcelona.
Year
DOI
Venue
2012
10.1016/j.eswa.2012.03.024
Expert Syst. Appl.
Keywords
Field
DocType
industrial need,different model,barcelona plant,production line,regularity constraint,mixed-model sequencing problem,nissan powertrain plant,gurobi solver,case study,work overload minimisation,parallel homogeneous processor,serial workstations,sequencing,manufacturing,linear programming
Computer science,Minimisation (psychology),Mixed model,Linear programming,Artificial intelligence,Powertrain,Industrial engineering,Homogeneous,Operations research,Workstation,Production line,Solver,Machine learning
Journal
Volume
Issue
ISSN
39
12
0957-4174
Citations 
PageRank 
References 
9
0.79
6
Authors
5
Name
Order
Citations
PageRank
Joaquín Bautista134527.50
Alberto Cano226918.88
Rocıo Alfaro3366.68
BautistaJoaquın490.79
AlfaroRocıo590.79