Title
Study of Artificial Neural Network Appraisal to Mine Coordination Development Ability
Abstract
The coordination development of mine was a complex nonlinear system, which included lots of factors. Based on analyzing the current methods for appraisal of coordination development of mine, an appraisal-index system was established. A neural network model with multi-hierarchic structure was built based on error back-propagation (BP) algorithm. This model could overcome many man-made factors with some advantages: lower rorrate; being of coordinatio development; convenient and reliable. The validity and accuracy of this method was proved by case study.
Year
DOI
Venue
2008
10.1109/ISIP.2008.117
ISIP
Keywords
Field
DocType
goal programming,shipping cost,mine,error back-propagation algorithm,conventional transportation problem,backpropagation,multihierarchic structure,coordination development ability,mining,mine coordination development,back-propagation algorithm,fuzzy number,calculation formula,artificial neural network appraisal,appraisal,complex nonlinear system,neural nets,fuzzy equation,indexes,data mining,environmental economics,indexation,concrete,nonlinear system,artificial neural networks,mathematical model,error back propagation,artificial neural network,neural network model,neural networks,mathematics,information processing
Back propagation algorithm,Information processing,Nonlinear system,Computer science,Artificial intelligence,Backpropagation,Artificial neural network,Valuation (finance),Machine learning
Conference
ISBN
Citations 
PageRank 
978-0-7695-3151-9
0
0.34
References 
Authors
2
1
Name
Order
Citations
PageRank
Jun Xu142.35