Title
Production planning system in clothing enterprises based on Drum-Buffer-Rope theory
Abstract
To solve the problem with low Due Date Performance (DDP) and throughput in clothing enterprises, we propose a new bottleneck scheduling algorithm, design and implement production planning system with a core of the algorithm based on Drum-Buffer-Rope (DBR) theory. Firstly, Shipping Buffer model is built for typical clothing enterprises; secondly, some problems of traditional scheduling for the bottleneck are discussed, and an Insertion neighborhood search algorithm and an example to minimize TDD are presented; thirdly, material releasing is created and the mechanism of three colored zone Buffer Management is introduced; finally, the system with the algorithm has successfully been implemented in one of the famous brand clothing enterprises and achieves good results, which bring high DDP and throughput to the enterprise. The enterprise economic efficiency also has improved.
Year
DOI
Venue
2010
10.1109/ICMLC.2010.5580984
ICMLC
Keywords
Field
DocType
scheduling,clothing enterprises,drum-buffer-rope theory,bottleneck scheduling,manufacturing systems,shipping buffer,clothing industry,drum-buffer-rope,throughput dollar day,buffer management,production planning,insertion neighborhood search,due date performance,production planning system,bottleneck scheduling algorithm,scheduling algorithm,economic efficiency,job shop scheduling,clothing,materials,throughput
Bottleneck,Scheduling (computing),Computer science,Clothing,Real-time computing,Artificial intelligence,Throughput,Rope,Economic efficiency,Job shop scheduling,Industrial engineering,Production planning,Machine learning
Conference
Volume
ISBN
Citations 
4
978-1-4244-6526-2
0
PageRank 
References 
Authors
0.34
5
3
Name
Order
Citations
PageRank
Xiu-Quan Xu100.68
Yi-Hong Ru274.89
Ling-Feng Liu300.34