Abstract | ||
---|---|---|
This paper presents the first steps in a research project that integrates two requirements engineering methodologies, B-SCP and MAP, in order to manage the evolution of strategic IT. Our integration approach presents a mechanism to validate and verify MAP requirements against B-SCP requirements and vice versa. MAP has an inbuilt Gap Analysis process which saves the overhead of inventing a new approach to deal with requirements evolution. In addition, MAP extends B-SCP's capability by the addition of non-deterministic process modelling. Our solution is evaluated on an exemplar case study which looks at a system built for Seven Eleven Japan. |
Year | DOI | Venue |
---|---|---|
2008 | 10.1016/j.infsof.2007.11.005 | Information & Software Technology |
Keywords | Field | DocType |
strategic alignment,b-scp,map requirement,requirements engineering,new approach,map,integration approach,eleven japan,exemplar case study,b-scp requirement,strategic it requirement,inbuilt gap analysis process,integrating b-scp,requirements engineering methodology,business strategy,requirements evolution,non-deterministic process modelling,evolution,process modelling,requirement engineering | Strategic alignment,Systems engineering,Computer science,Process modeling,Requirements engineering,Requirements management,Requirement,Strategic management,Requirements evolution | Journal |
Volume | Issue | ISSN |
50 | 7-8 | Information and Software Technology |
Citations | PageRank | References |
5 | 0.41 | 25 |
Authors | ||
5 |
Name | Order | Citations | PageRank |
---|---|---|---|
Abdul Babar | 1 | 26 | 3.13 |
Karl Cox | 2 | 213 | 10.50 |
Vladimir Tosic | 3 | 489 | 52.12 |
Steven J. Bleistein | 4 | 322 | 16.95 |
June M. Verner | 5 | 1255 | 75.85 |