Title
Models for MMSP-W considering workstation dependencies: A case study of Nissan's Barcelona plant.
Abstract
In this article, we present two formulations and their unification for the Mixed-Model Sequencing Problem with Workload Minimisation (MMSP-W) for production lines with serial workstations and parallel homogeneous processors. The models were executed in Solver CPLEX, with reference instances and with a case study of Nissan's Powertrain plant in Barcelona. Different situations were analysed to evaluate investments in projects designed to improve process and product design and reduce work overloads in the line at short-, intermediate- and long-term intervals. (C) 2012 Elsevier B.V. All rights reserved.
Year
DOI
Venue
2012
10.1016/j.ejor.2012.07.006
European Journal of Operational Research
Keywords
Field
DocType
Manufacturing,Sequencing,Work overload,Linear programming,Mixed-model system
Powertrain,Workload,Workstation,Minimisation (psychology),Production line,Linear programming,Solver,Product design,Operations management,Mathematics
Journal
Volume
Issue
ISSN
223
3
0377-2217
Citations 
PageRank 
References 
4
0.46
8
Authors
3
Name
Order
Citations
PageRank
Joaquín Bautista134527.50
Alberto Cano226918.88
Rocío Alfaro3111.50