Title
Expected Response Times for Closed-Loop Multivehicle AMHS
Abstract
We present an analytical approach for estimating the expected time for an automated material handling system (AMHS) to respond to move requests at loading stations in a vehicle-based, unidirectional, closed-loop AMHS. The expected response times are important for estimating the expected work-in-process (WIP) levels at the loading stations for design purposes, and for evaluating the performance of ...
Year
DOI
Venue
2007
10.1109/TASE.2007.906141
IEEE Transactions on Automation Science and Engineering
Keywords
Field
DocType
Materials handling,Analytical models,Production systems,Delay estimation,Electronics industry,Productivity,Manufacturing automation,Costs,Investments,Process design
Production cycle,Scale model,Markov process,Computer science,Simulation,Wafer fabrication,Markov chain,Response time,Material handling,Time response
Journal
Volume
Issue
ISSN
4
4
1545-5955
Citations 
PageRank 
References 
5
0.61
5
Authors
2
Name
Order
Citations
PageRank
Dima Nazzal1385.64
Leon F. McGinnis249450.09