Title | ||
---|---|---|
Scheduling Mixed-Model Production on Multiple Assembly Lines with Shared Resources Using Genetic Algorithms: The Case Study of a Motorbike Company. |
Year | DOI | Venue |
---|---|---|
2014 | 10.1155/2014/874031 | ADS |
Field | DocType | Volume |
Mathematical optimization,Job shop scheduling,Fair-share scheduling,Industrial engineering,Scheduling (computing),Computer science,Scheduling (production processes),Real-time computing,Two-level scheduling,Genetic algorithm scheduling,Rate-monotonic scheduling,Dynamic priority scheduling | Journal | 2014 |
Citations | PageRank | References |
1 | 0.35 | 6 |
Authors | ||
4 |
Name | Order | Citations | PageRank |
---|---|---|---|
Francesco Costantino | 1 | 67 | 10.31 |
Alberto Felice De Toni | 2 | 1 | 0.35 |
Giulio Di Gravio | 3 | 71 | 9.44 |
Fabio Nonino | 4 | 24 | 5.35 |