Title | ||
---|---|---|
Grey Wolf Optimizer algorithm for the two-stage assembly flow shop scheduling problem with release time. |
Abstract | ||
---|---|---|
•Studying two-stage assembly flow shop scheduling problem with release time of jobs.•Finding the jobs sequence such that completion of the last processed job (makespan) is minimized.•Proposing a noble algorithm called Grey Wolf Optimizer (GWO) inspired from living and haunting behavior of wolves for solving the studied problem.•Developing a lower bound as well as several heuristic algorithms. |
Year | DOI | Venue |
---|---|---|
2015 | 10.1016/j.jocs.2015.03.011 | Journal of Computational Science |
Keywords | Field | DocType |
Assembly flow shop scheduling,Makespan,Release time,Grey Wolf Optimizer | Heuristic,Mathematical optimization,Manufacturing,Job shop scheduling,Upper and lower bounds,Computer science,Flow shop scheduling,Algorithm,Theoretical computer science,Statistical analysis,Gray (horse) | Journal |
Volume | ISSN | Citations |
8 | 1877-7503 | 13 |
PageRank | References | Authors |
0.51 | 7 | 2 |
Name | Order | Citations | PageRank |
---|---|---|---|
Gh. M. Komaki | 1 | 21 | 0.93 |
Vahid Kayvanfar | 2 | 71 | 4.43 |