Abstract | ||
---|---|---|
We consider the job shop scheduling problem with fuzzy durations and expected makespan minimisation. We formally define the space of semi-active and active fuzzy schedules and propose and analyse different schedule-generation schemes (SGSs) in this fuzzy framework. In particular, we study dominance properties of the set of schedules obtained with each SGS. Finally, a computational study illustrates the great difference between the spaces of active and the semi-active fuzzy schedules, an analogous behaviour to that of the deterministic job shop. |
Year | DOI | Venue |
---|---|---|
2014 | 10.3233/978-1-61499-419-0-687 | Frontiers in Artificial Intelligence and Applications |
Field | DocType | Volume |
Mathematical optimization,Makespan minimisation,Job shop scheduling,Job shop scheduling problem,Computer science,Job shop,Fuzzy logic,Flow shop scheduling,Schedule | Conference | 263 |
ISSN | Citations | PageRank |
0922-6389 | 5 | 0.44 |
References | Authors | |
9 | 4 |
Name | Order | Citations | PageRank |
---|---|---|---|
Juan José Palacios | 1 | 59 | 6.73 |
Camino R. Vela | 2 | 346 | 31.00 |
Inés González Rodríguez | 3 | 72 | 6.52 |
Jorge Puente | 4 | 171 | 13.16 |