Title
Maintaining tracks and traffic flow at the same time
Abstract
•Our model simultaneously schedules trains and track possessions in a railway network.•We minimize traffic disturbance caused by a fixed set of maintenance jobs.•Routes suitable for train rerouting and time windows for possessions are model input.•Start times for possessions and modified, possibly rerouted, trains are model output.•Optionally, cancellations can be allowed as an alternative to rerouting and delays.
Year
DOI
Venue
2013
10.1016/j.jrtpm.2013.11.001
Journal of Rail Transport Planning & Management
Keywords
Field
DocType
Timetabling,Conflict minimization,Track possession planning
Planned maintenance,Traffic flow,Track (rail transport),Transport engineering,Operations research,Schedule,Integer programming,Engineering,Train,Mathematical model,Preventive maintenance
Journal
Volume
Issue
ISSN
3
3
2210-9706
Citations 
PageRank 
References 
9
0.72
5
Authors
3
Name
Order
Citations
PageRank
Malin Forsgren1101.76
Martin Aronsson2216.02
Sara Gestrelius3173.35