Title | ||
---|---|---|
A bi-level evolutionary optimization approach for integrated production and transportation scheduling. |
Abstract | ||
---|---|---|
•The integrated scheduling problem is formulated as a bi-level mixed-integer nonlinear program.•Consider unrelated parallel-machine environment and product batch-based delivery.•An evolution-strategy-based bi-level evolutionary approach is developed.•The proposed approach is superior to other 3 intelligent algorithms-based approaches. |
Year | DOI | Venue |
---|---|---|
2016 | 10.1016/j.asoc.2016.01.052 | Applied Soft Computing |
Keywords | Field | DocType |
Supply chain scheduling,Production and distribution,Bi-level programming,Bi-level evolutionary algorithm | Integer,Memetic algorithm,Mathematical optimization,Heuristic,Job shop scheduling,Nonlinear system,Integrated production,Transportation scheduling,Supply chain,Mathematics | Journal |
Volume | Issue | ISSN |
42 | C | 1568-4946 |
Citations | PageRank | References |
5 | 0.42 | 20 |
Authors | ||
4 |
Name | Order | Citations | PageRank |
---|---|---|---|
Zhaoxia Guo | 1 | 13 | 5.25 |
Dongqing Zhang | 2 | 5 | 1.10 |
S. Y. S. Leung | 3 | 227 | 13.99 |
Leyuan Shi | 4 | 361 | 51.32 |