Abstract | ||
---|---|---|
Container terminal's competitiveness is generally measured by the vessel discharging and loading time. The shore crane operation has attracted a number of research works. However, yard operation management has been very much experience based and did not receive much attention until last decade. This paper presents an algorithm and a mathematical model for the optimal yard crane deployment. The potential of the model in optimizing yard crane deployment was tested with a set of real operation data extracted from a major container yard terminal. |
Year | DOI | Venue |
---|---|---|
2003 | 10.1016/S0360-8352(03)00046-9 | Computers & Industrial Engineering |
Keywords | Field | DocType |
Crane deployment,Container terminal,Network model | Software deployment,Gantry crane,Yard,Shore,Engineering,Network model,Operations management | Journal |
Volume | Issue | ISSN |
45 | 3 | 0360-8352 |
Citations | PageRank | References |
21 | 1.72 | 1 |
Authors | ||
5 |
Name | Order | Citations | PageRank |
---|---|---|---|
Richard Linn | 1 | 110 | 7.93 |
Jiyin Liu | 2 | 645 | 47.63 |
Yat-wah Wan | 3 | 183 | 17.51 |
Chuqian Zhang | 4 | 21 | 1.72 |
Katta G. Murty | 5 | 602 | 95.15 |