Year | Venue | Field |
---|---|---|
2011 | IJSPM | Technical feasibility,Synchronization,Production control,Decision support system,Control engineering,Flexible manufacturing system,Engineering,Observer (quantum physics),Real-time simulation,Operations management,Discrete event simulation |
DocType | Volume | Issue |
Journal | 6 | 3 |
Citations | PageRank | References |
4 | 0.40 | 1 |
Authors | ||
2 |
Name | Order | Citations | PageRank |
---|---|---|---|
Olivier Cardin | 1 | 33 | 5.79 |
Pierre Castagna | 2 | 55 | 5.80 |