Title | ||
---|---|---|
New graph-based algorithms to efficiently solve large scale open pit mining optimisation problems |
Abstract | ||
---|---|---|
•Two graph-based algorithms are developed for large-scale mining problems.•The proposed algorithms outperform other existing solution approaches.•This study leads to a more applicable mining optimisation software system. |
Year | DOI | Venue |
---|---|---|
2016 | 10.1016/j.eswa.2015.08.044 | Expert Systems with Applications |
Keywords | DocType | Volume |
Mine optimisation algorithms,Planning and scheduling,Mine block sequencing,Ultimate pit limit,Constrained pit limit,Network flow graph | Journal | 43 |
Issue | ISSN | Citations |
C | 0957-4174 | 10 |
PageRank | References | Authors |
0.56 | 24 | 2 |
Name | Order | Citations | PageRank |
---|---|---|---|
Shi Qiang Liu | 1 | 64 | 5.40 |
Erhan Kozan | 2 | 315 | 32.28 |