Abstract | ||
---|---|---|
Currently the methodology of eliminating the negative effects of the issues in ramp-up stage mostly involves the increase in investment and updating the design data. In the paper the authors consider an approach that can be applied on every level of ramp-up production: from suppliers to shopfloor operators. The architecture of the system is described and the first implementation results are given. |
Year | DOI | Venue |
---|---|---|
2015 | 10.1007/978-3-319-22867-9_14 | HoloMAS |
Field | DocType | Citations |
Production manager,Architecture,Industrial engineering,Manufacturing engineering,Operator (computer programming),Engineering | Conference | 0 |
PageRank | References | Authors |
0.34 | 3 | 3 |
Name | Order | Citations | PageRank |
---|---|---|---|
Daria Kazanskaia | 1 | 14 | 2.95 |
Yaroslav Shepilov | 2 | 2 | 1.79 |
Bjorn Madsen | 3 | 4 | 1.01 |