A Cooperative Approach to Dispatching and Scheduling Twin-Yard Cranes in Container Terminals. |
Abstract | ||
---|---|---|
To increase the productivity of the storage yard of a container terminal, two identical yard cranes are often deployed in a yard block. In theory, the productivity of a yard block may be doubled with twin-cranes. However, crane interference may severely lower the combined productivity of the twin-cranes. In this paper, we propose an online job dispatching method for twin yard cranes when side loading is used. The method adopts the non-zero-sum game approach to induce the cooperative behaviour in the dispatching and scheduling of jobs for the two cranes to minimize the total job completion time. A one-step lookahead algorithm and a two-step lookahead algorithm are proposed. We evaluate our algorithms against Ng’s lower bound of total completion time for twin-cranes and against the greedy heuristic Smallest Completion Time-First. Our experiments showed that our dispatching and scheduling algorithm performs very well. |
Year | Venue | Field |
---|---|---|
2016 | ICCL | Mathematical optimization,Scheduling (computing),Upper and lower bounds,Computer science,Yard,Theoretical computer science,Greedy algorithm,Interference (wave propagation),Embedded system |
DocType | Citations | PageRank |
Conference | 0 | 0.34 |
References | Authors | |
9 | 2 |
Name | Order | Citations | PageRank |
---|---|---|---|
Shell Ying Huang | 1 | 161 | 19.52 |
Ya Li | 2 | 0 | 1.69 |