Title | ||
---|---|---|
A note on decision making method for product acceptance based on process capability indices Cpk and Cpmk. |
Abstract | ||
---|---|---|
•Inappropriate plan parameter derivation for variables sampling plans is addressed.•The actual α‐risk might be larger than the maximum one desired by the producer.•Correct plan parameters are recalculated to overwrite those in the original papers.•Two applicative examples show practical consequences of the proposed corrections. |
Year | DOI | Venue |
---|---|---|
2018 | 10.1016/j.ejor.2017.12.032 | European Journal of Operational Research |
Keywords | Field | DocType |
Quality control,Process capability indices,Critical acceptance values,Process capability analysis,Lot resubmission | Normality,Process capability,Mathematical optimization,Operations research,Sampling (statistics),Process capability index,Mathematics,Sample size determination,Variables sampling plan | Journal |
Volume | Issue | ISSN |
267 | 1 | 0377-2217 |
Citations | PageRank | References |
1 | 0.35 | 5 |
Authors | ||
3 |
Name | Order | Citations | PageRank |
---|---|---|---|
Antonio Lepore | 1 | 5 | 3.56 |
B. Palumbo | 2 | 6 | 3.31 |
Philippe Castagliola | 3 | 529 | 61.65 |