Title
Max-weight scheduling across multiple timescales.
Abstract
Many systems consist of a mixture of various resource types that together support better performance relative to those with a single resource type. One important characteristic of these systems is the fact that the various comprising resource types can operate on different timescales, implying that the corresponding control decisions are not made simultaneously. To address the resulting scheduling problem, we present and analyze two variants of max-weight scheduling that are designed to deal with the different timescales of such systems.
Year
DOI
Venue
2018
10.1016/j.orl.2018.01.012
Operations Research Letters
Keywords
Field
DocType
Multiple timescale systems,Hybrid networks,Markov processes,Scheduling,Stability
Mathematical optimization,Markov process,Job shop scheduling,Scheduling (computing),Mathematics
Journal
Volume
Issue
ISSN
46
2
0167-6377
Citations 
PageRank 
References 
0
0.34
7
Authors
2
Name
Order
Citations
PageRank
Mark S. Squillante11366157.28
Peter M. van de Ven2528.23