Title | ||
---|---|---|
Algorithms for the unrelated parallel machine scheduling problem with a resource constraint. |
Abstract | ||
---|---|---|
•Resource-constrained unrelated parallel machine scheduling problem is addressed.•A method combining mixed-integer and constraint programming models is proposed.•A mathematical model for the special case with two machines is also proposed.•The new methods outperform all those previously proposed in the literature.•Difficult types of problem instances are identified for future research. |
Year | DOI | Venue |
---|---|---|
2018 | 10.1016/j.ejor.2018.05.056 | European Journal of Operational Research |
Keywords | Field | DocType |
Scheduling,Unrelated parallel machines,Renewable resource,Mixed-integer linear programming,Constraint programming | Mathematical optimization,Heuristic,Machine scheduling,Upper and lower bounds,Constraint programming,Algorithm,Linear programming,Hot start,Mathematics,Computation | Journal |
Volume | Issue | ISSN |
271 | 3 | 0377-2217 |
Citations | PageRank | References |
6 | 0.40 | 9 |
Authors | ||
2 |
Name | Order | Citations | PageRank |
---|---|---|---|
Krzysztof Fleszar | 1 | 368 | 25.38 |
Khalil S. Hindi | 2 | 398 | 22.75 |