Title | ||
---|---|---|
Integrated production and transportation on parallel batch machines to minimize total weighted delivery time. |
Abstract | ||
---|---|---|
•We consider production-distribution scheduling problem on parallel batch machines with multiple vehicles.•A mixed-integer programming (MIP) model is formulated to verify the correctness of the implementation of the heuristics.•A deterministic heuristic H and two ACO-based heuristics are proposed to solve the problem.•Experimental results show that the MMAS algorithm slightly beats the HACO algorithm, which shows the better performance than Algorithm H. |
Year | DOI | Venue |
---|---|---|
2019 | 10.1016/j.cor.2018.07.026 | Computers & Operations Research |
Keywords | Field | DocType |
Batch processing machines,Non-identical job sizes,Integrated production and transportation,Local optimization,Ant colony optimization algorithm | Ant colony optimization algorithms,Mathematical optimization,Heuristic,Job shop scheduling,Integrated production,Upper and lower bounds,Batch processing,Local search (optimization),Ant colony,Mathematics | Journal |
Volume | ISSN | Citations |
102 | 0305-0548 | 0 |
PageRank | References | Authors |
0.34 | 16 | 4 |
Name | Order | Citations | PageRank |
---|---|---|---|
Zhao-Hong Jia | 1 | 57 | 6.70 |
Xue-Xue Zhuo | 2 | 0 | 0.68 |
Joseph Y. -T. Leung | 3 | 2403 | 400.82 |
Kai Li | 4 | 84 | 12.99 |