Abstract | ||
---|---|---|
This paper demonstrates a double layer optimization strategy to determine the optimum size of battery energy storage system (BESS) considering the EMS of a microgrid (MG). In the developed model, the BESS sizing problem is viewed as the outer optimal loop and the economic dispatch of MG based on BESS data from the outer loop is considered as inner loop. An iterative method and a dynamic programming (DP) method are utilized to solve the optimal problems for outer and inner models respectively. A simulator is built in MATLAB environment for an island microgrid is used to evaluate the efficiency of the proposed method. |
Year | DOI | Venue |
---|---|---|
2018 | 10.1109/IECON.2018.8591391 | IECON 2018 - 44TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY |
Field | DocType | ISSN |
Inner loop,Dynamic programming,Energy management,Economic dispatch,MATLAB,Control theory,Iterative method,Sizing,Engineering,Microgrid | Conference | 1553-572X |
Citations | PageRank | References |
0 | 0.34 | 0 |
Authors | ||
5 |
Name | Order | Citations | PageRank |
---|---|---|---|
M. C. Pham | 1 | 0 | 0.34 |
Tuan Quoc Tran | 2 | 0 | 0.34 |
Seddik Bacha | 3 | 53 | 17.58 |
Ahmad Hably | 4 | 112 | 16.79 |
Luu Ngoc An | 5 | 0 | 0.34 |