Robust and Fuzzy Optimisation Models for a Flow shop Scheduling Problem with Sequence Dependent Setup Times: A real case study on a PCB assembly company. |
Abstract | ||
---|---|---|
In this paper, authors considered a flow shop scheduling problem with sequence dependent set-up times in an uncertain environment. Its objective function is to minimise weighted mean completion time. As for uncertainty, set-up and processing times are considered not to be deterministic. Authors propose two different approaches to deal with uncertainty of input data: robust optimisation RO and fuzzy optimisation. First, a deterministic mixed-integer linear programming model is presented for the general problem. Then, its robust counterpart of the proposed model is dealt with. Afterwards, the fuzzy flow shop model is developed. Moreover, a real case study on Tehran-Madar Company which is a producer of printed circuit board and OEMs is studied. Finally, a considerable discussion is held on comparison of all three approaches of namely deterministic, fuzzy and ROs based on some generated numerical examples. |
Year | DOI | Venue |
---|---|---|
2017 | 10.1080/0951192X.2016.1187293 | Int. J. Computer Integrated Manufacturing |
Keywords | Field | DocType |
flow shop scheduling problem, robust optimisation, fuzzy optimisation, MILP, uncertainty | Mathematical optimization,Sequence-dependent setup,Original equipment manufacturer,Fuzzy logic,Flow shop scheduling,Printed circuit board,Linear programming,Engineering,Weighted arithmetic mean | Journal |
Volume | Issue | ISSN |
30 | 6 | 0951-192X |
Citations | PageRank | References |
3 | 0.37 | 16 |
Authors | ||
4 |
Name | Order | Citations | PageRank |
---|---|---|---|
Seyed Mohammad Gholami-Zanjani | 1 | 3 | 0.37 |
Mohammadmehdi Hakimifar | 2 | 3 | 0.37 |
Najmesadat Nazemi | 3 | 3 | 0.37 |
Fariborz Jolai | 4 | 424 | 34.19 |