Abstract | ||
---|---|---|
A new control chart, namely, modified exponentially weighted moving average (EWMA) control chart, for monitoring the process variance is introduced in this work by following the recommendations of Khan et al.(15) The proposed control chart deduces the existing charts to be its special cases. The necessary coefficients, which are required for the construction of modified EWMA chart, are determined for various choices of sample sizes and smoothing constants. The performance of the proposed modified EWMA is evaluated in terms of its run length (RL) characteristics such as average RL and standard deviation of RL. The efficiency of the modified EWMA chart is investigated and compared with some existing control charts. The comparison reveals the superiority of proposal as compared with other control charts in terms of early detection of shift in process variation. The application of the proposal is also demonstrated using a real-life dataset. |
Year | DOI | Venue |
---|---|---|
2020 | 10.1002/qre.2576 | QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL |
Keywords | Field | DocType |
control charts,modified EWMA statistic,Monte Carlo simulation,process variation,run length | Monte Carlo method,EWMA chart,Control chart,Process variation,Engineering,Statistics | Journal |
Volume | Issue | ISSN |
36.0 | 1.0 | 0748-8017 |
Citations | PageRank | References |
1 | 0.35 | 0 |
Authors | ||
5 |
Name | Order | Citations | PageRank |
---|---|---|---|
Aamir Saghir | 1 | 32 | 6.20 |
Muhammad Aslam | 2 | 7 | 5.64 |
Alireza Faraz | 3 | 59 | 8.74 |
Liaquat Ahmad | 4 | 1 | 0.35 |
cedric heuchenne | 5 | 8 | 3.04 |