Title | ||
---|---|---|
Reliability assessment and activation sequence optimization of non-repairable multi-state generation systems considering warm standby |
Abstract | ||
---|---|---|
•Multi-state decision diagram method for reliability of power systems is proposed.•The method allows warm standby systems with any transition time distributions.•Successful start-up probabilities of warm standby units are considered.•The proposed method enables the automated calculation of system reliability.•Optimal activation sequence of units is formulated to maximize system reliability. |
Year | DOI | Venue |
---|---|---|
2020 | 10.1016/j.ress.2019.106736 | Reliability Engineering & System Safety |
Keywords | Field | DocType |
Reliability assessment,Activation sequence optimization,Power generation systems,Warm standby,Multi-state decision diagram | Cold standby,Hot spare,Transition time,Influence diagram,Engineering,Energy consumption,Electricity generation,Reliability engineering | Journal |
Volume | ISSN | Citations |
195 | 0951-8320 | 0 |
PageRank | References | Authors |
0.34 | 0 | 5 |
Name | Order | Citations | PageRank |
---|---|---|---|
Heping Jia | 1 | 0 | 1.01 |
Yi Ding | 2 | 100 | 37.68 |
Rui Peng | 3 | 246 | 30.45 |
Hanlin Liu | 4 | 0 | 0.34 |
Yonghua Song | 5 | 16 | 7.16 |