Abstract | ||
---|---|---|
In a steel industry, a slab yard plays a role of a buffer between continuous casting stage and rolling mill. An effective assignment and scheduling of cranes can guarantee the operation efficiency in the slab yard. This work studies a multicrane scheduling problem with noncrossing constraints of slabs. A mixed-integer programming model is used to formulate the problem that minimizes the whole trav... |