Title
An Improved MOEA/D Algorithm for the Carbon Black Production Line Static and Dynamic Multiobjective Scheduling Problem.
Abstract
The make-to-order (MTO) manufacturers generally make production plans based on orders, which can help enterprises effectively avoid market risks, reduce market pressure and improve competitiveness. However, due to the characteristics of MTO production mode, the order static scheduling problem and rush order dynamic rescheduling problem have become more and more important for these MTO manufacturers. Therefore, in this paper, we take the packaging production line of a typical carbon black production enterprise as the research background to study the carbon black production line static and dynamic multiobjective scheduling problem. Firstly, multiobjective optimization models of both order static scheduling and rush order dynamic rescheduling are established. Then the improved MOEA/D algorithm combined the heuristic algorithm based on heuristic rules and discrete dynamic local search is developed to solve these two models. Based on the actual production data, eight instances of order static scheduling problems of different scales and four instances of rush order dynamic rescheduling problems of different scales are constructed respectively. Experimental results illustrate that the improved MOEA/D is effective and superior in solving these two problems.
Year
DOI
Venue
2020
10.1109/CEC48606.2020.9185560
CEC
DocType
Citations 
PageRank 
Conference
0
0.34
References 
Authors
0
4
Name
Order
Citations
PageRank
Yao Wang12312.50
Zhiming Dong2152.21
Tenghui Hu300.34
Xianpeng Wang423117.11