Title
Challenges associated with realization of lot level fab out forecast in a giga wafer fabrication plant
Abstract
ABSTRACTIn the semiconductor industry a reliable delivery forecast is helpful to optimize demand planning. Very often cycle time estimations for frontend, backend production, testing and transits are used to predict delivery times on product level and to determine when products have to be started to fulfill customer demands on time. Frontend production usually consumes a big portion of the cycle time of a product. Therefore a reliable cycle time estimation for a frontend production is crucial for the accuracy of the overall cycle time prediction. We compare two different methods to predict cycle times and delivery forecasts on product and lot level for a frontend production: a Big Data approach, where historical data is analyzed to predict future behavior, and a fab simulation model.
Year
DOI
Venue
2020
10.5555/3466184.3466384
Winter Simulation Conference
DocType
Citations 
PageRank 
Conference
0
0.34
References 
Authors
0
6
Name
Order
Citations
PageRank
Georg Seidel101.69
Ching Foong Lee200.34
Aik Ying Tang300.34
Soo Leen Low400.34
Boon Ping Gan500.68
Wolfgang Scholl600.34