Title
Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines
Abstract
AbstractHighlights •A MILP model with maintenance level and assembly machine assignment is developed.•Two heuristics with the latest PM strategy are designed.•A new algorithm with problem-specific evaluation and two local search is proposed.•The proposed algorithm outperforms 9 state-of-the-art methods in 720 instances. AbstractIn this paper, preventive maintenance (PM) activities are incorporated into two-stage assembly flow shop scheduling where m1 dedicated machines in fabrication stage and m2 machines in assembly stage. Each machine is given a new feature maintenance level, whose initial value is determined based on the Weibull probability distribution. To ensure the machines’ reliability and production continuity, we need to find a fit product sequence along with PM execution time points. Hence this paper tries to tackle this new integration problem by a mixed integer linear programming model, two heuristics MCMTPM and NEHPM, and a PM-based iterated greedy algorithm (IGPM). IGPM is embedded with a problem-specific solution evaluation and two types of local search methods. The final experimental results show that compared with the other 9 state-of-the-art methods, the proposed IGPM embedded with NEHPM and reference local search generates the best results in all benchmark instances.
Year
DOI
Venue
2021
10.1016/j.cie.2021.107493
Periodicals
Keywords
DocType
Volume
Multiple assembly machines, Assembly flow shop, Preventive maintenance, Heuristics, Meta-heuristic
Journal
159
Issue
ISSN
Citations 
C
0360-8352
0
PageRank 
References 
Authors
0.34
0
2
Name
Order
Citations
PageRank
Zikai Zhang185.89
Qiuhua Tang200.34