Title | ||
---|---|---|
An iterated greedy algorithm for the parallel blocking flow shop scheduling problem and sequence-dependent setup times |
Abstract | ||
---|---|---|
•Effective heuristic for the parallel blocking flow shop problem with setup times.•Performance evaluation of different neighbourhood structures and local searches.•Performance evaluation of different initial solution procedures.•The best performing constructive method does not lead to obtaining better solutions.•The level of setup times has slightly influence on the behavior of heuristics. |
Year | DOI | Venue |
---|---|---|
2021 | 10.1016/j.eswa.2021.115535 | Expert Systems with Applications |
Keywords | DocType | Volume |
Parallel Flow Shop,Sequence-dependent Setup times,Makespan,Distributed Flow Shop,Blocking | Journal | 184 |
ISSN | Citations | PageRank |
0957-4174 | 1 | 0.35 |
References | Authors | |
14 | 3 |
Name | Order | Citations | PageRank |
---|---|---|---|
Imma Ribas | 1 | 77 | 5.30 |
Ramón Companys | 2 | 66 | 4.01 |
Xavier Tort-martorell | 3 | 28 | 4.78 |