On-line monitoring of extreme values of geometric profiles in finite horizon processes. | 0 | 0.34 | 2020 |
An EWMA sign control chart with varying control limits for finite horizon processes. | 0 | 0.34 | 2018 |
Monitoring compositional data using multivariate exponentially weighted moving average scheme. | 0 | 0.34 | 2018 |
The Shewhart F control chart for monitoring processes with finite number of inspections. | 0 | 0.34 | 2018 |
A Variable Sampling Interval Shewhart Control Chart For Monitoring The Coefficient Of Variation In Short Production Runs | 5 | 0.47 | 2017 |
Monitoring the Ratio of Two Normal Variables Using EWMA Type Control Charts | 1 | 0.41 | 2016 |
Joint Shewhart control charts for location and scale monitoring in finite horizon processes. | 0 | 0.34 | 2016 |
A Synthetic Control Chart for Monitoring the Ratio of Two Normal Variables. | 3 | 0.42 | 2016 |
Design of a Phase II Control Chart for Monitoring the Ratio of two Normal Variables. | 1 | 0.43 | 2016 |
Control Charts monitoring Product's Loss to Society. | 0 | 0.34 | 2014 |
Statistical Performance of a Control Chart for Individual Observations Monitoring the Ratio of Two Normal Variables. | 2 | 0.48 | 2014 |
Performance of t control charts in short runs with unknown shift sizes | 16 | 1.49 | 2013 |
Monitoring the Coefficient of Variation Using a Variable Sampling Interval Control Chart. | 4 | 0.59 | 2013 |
The economic performance of the Shewhart t chart. | 3 | 0.59 | 2012 |
Flow Shop Group Scheduling With Limited Buffer Capacity And Different Workforce | 0 | 0.34 | 2011 |
Shewhart and EWMA t control charts for short production runs. | 3 | 0.57 | 2011 |
Economic design of inspection strategies to monitor dispersion in short production runs | 4 | 0.57 | 2010 |
A new efficient encoding/decoding procedure for the design of a supply chain network with genetic algorithms | 19 | 0.79 | 2010 |
A variable sampling interval S2-EWMA control chart for monitoring the process variance. | 7 | 1.24 | 2007 |
Human factor policy testing in the sequencing of manual mixed model assembly lines | 6 | 0.70 | 2004 |
An Evolutionary Algorithm For Pure Fuzzy Flowshop Scheduling Problems | 18 | 0.92 | 2003 |
Fuzzy scheduling of a flexible assembly line through evolutionary algorithms | 0 | 0.34 | 2001 |