Abstract | ||
---|---|---|
A permutational flowshop group scheduling problem (GSP) with sequence dependent set-up times, finite interoperational buffer capacity and workers with different skills has been investigated in this paper. The set-up times are influenced by the sequence of groups and the worker skill level; the manufacturing tasks on a part are completely automated and the working times do not depend on the operator's skill. The minimization of the completion time is the objective of the group scheduling. A Genetic Algorithm is proposed as an efficient tool to solve the investigated problem; a benchmark of problems has been generated to investigate the influence of the inter-operational buffer capacity and the worker skill level on the completion time. |
Year | Venue | Keywords |
---|---|---|
2011 | ICINCO 2011: PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 2 | Group scheduling, Workforce, Genetic algorithm |
Field | DocType | Citations |
Workforce,Flow shop scheduling,Operations research,Control engineering,Engineering,Group scheduling | Conference | 0 |
PageRank | References | Authors |
0.34 | 0 | 3 |
Name | Order | Citations | PageRank |
---|---|---|---|
Giovanni Celano | 1 | 92 | 12.38 |
Antonio Costa | 2 | 72 | 7.14 |
Sergio Fichera | 3 | 102 | 11.40 |